• last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
Changed all .as files from binary to ascii in order to use diff tool correctly in Eclipse

  1. … 199 more files in changeset.
LDEV-991 merged/implemented complex view code in monitor

  1. … 11 more files in changeset.
LDEV-991 display of complex activities (opt seqs, opt acts, parallel acts) is working, need improvements to control of activities on complex layer.

  1. … 11 more files in changeset.
LDEV-1518 Fixed branching inside branching, problem was depth level on close button. LDEV-991 Starting off setting up temp layer for displaying complex activities (of within complex).

  1. … 12 more files in changeset.
LDEV-1501 Fixed branch canvas position/size when canvas is scrolled down or across.

  1. … 6 more files in changeset.
LDEV-1449 Fixed problem with optional sequences in design and loading learner tab.

  1. … 7 more files in changeset.
LDEV-1468 Fixed depth problem.

  1. … 5 more files in changeset.
LDEV-1285 Enabled selection of sequences and Property Inspector intergration. Improved reordering control to restrict to sequence dimensions.

  1. … 10 more files in changeset.
LDEV-1370 fixed selection highlighting and design order for learnertabview

  1. … 6 more files in changeset.
LDEV-1370 Closing branching view on refresh and little fix for transparent cover redrawing.

  1. … 9 more files in changeset.
a few neat UI improvements for branching - utilise scroll pane in branching view + move the bin into the view with open + fixed up transition/system tool x/y positioning on-drop

  1. … 7 more files in changeset.
improved canvas branch view - adding canvas activities (group, branching, optional activities etc)

  1. … 5 more files in changeset.
improved branch view - can add activities/transitions to branch view

  1. … 7 more files in changeset.
improved transition opening branching view (adding modality) + transparent fade on unactive canvas views + minimize icon

  1. … 6 more files in changeset.
first stage opening second-level (branching) canvas layer + featuring zoom transition

  1. … 8 more files in changeset.
adding branch activity to sequence - basic model/dto changes and packet handling

  1. … 19 more files in changeset.
adding new flash project - contains all flash fla and as files

    • -0
    • +86
    ./CommonCanvasView.as
  1. … 270 more files in changeset.